Named capital projects — roads, rail, power, hospitals, schools — funded during the 2023–present term. Tracks whether the allocated budget actually built the named thing, and how far it got.
11
Total projects
3
Completed
8
Ongoing
0
Stalled or abandoned
Transport
Lagos–Calabar Coastal Highway
Ongoing
What it is
700–800km six-lane concrete coastal highway from Lagos to Calabar, built under an EPC+F model with provision for a rail line in the median.
Progress & spend
₦1,067bn allocated · Contractor: Hitech Construction Company
Change history
27 Sept 2026Corrected — outcome — The cited source (dated Sept 2026) describes the remaining 17.47km as still under construction, contradicting the previous "~98% complete as of May 2026" claim. Rewritten to match what the source actually says; no completion percentage is asserted since the source gives none.
Transport
Sokoto–Badagry Superhighway
Ongoing
What it is
1,068km superhighway conceived over 45 years ago and revived under Tinubu; a spur of the Lagos–Calabar corridor linking the North-West to the South-West.
Progress & spend
Contractor: Hitech Construction Company
Energy
Ajaokuta–Kaduna–Kano (AKK) Gas Pipeline
Ongoing
What it is
614km gas pipeline from Ajaokuta to Kano, financed by NNPC, missing successive deadlines since the original June 2022 target.
Progress & spend
95% physically complete · Contractor: Oilserv Limited
Transport
Kaduna–Kano Standard Gauge Railway
Ongoing
What it is
203km standard-gauge line from Kaduna to Kano, the Nigerian leg of the Kano–Maradi corridor; at 15% completion when Tinubu took office.
Progress & spend
85% physically complete · Contractor: China Civil Engineering Construction Corporation (CCECC)
Transport
Port Harcourt–Maiduguri Narrow Gauge Rehabilitation
Ongoing
What it is
Rehabilitation of the 1,443km eastern narrow-gauge corridor, awarded October 2020; works recommenced under Tinubu after stalling in 2021.
Progress & spend
Contractor: China Civil Engineering Construction Corporation (CCECC)
Energy
Zungeru Hydroelectric Power Plant (700MW)
completed
What it is
700MW (4×175MW) hydropower plant, Nigeria's second-largest, costing ~$1.3bn with Chinese Exim financing; construction completed just before Tinubu's inauguration.
Progress & spend
100% physically complete · Contractor: CNEEC/Sinohydro consortium
Change history
28 Sept 2026Source tier: official → reporting — Reclassified: gevernova.com is the plant vendor's own press release, not a government or official record. Was mislabeled "official".
Transport
Abuja Light Rail (Commercial Operations Relaunch)
completed
What it is
First rapid transit system in Nigeria, originally commissioned July 2018; suspended March 2020 due to COVID-19/vandalism; commercial operations relaunched by Tinubu on 29 May 2024 with free rides through December 2024.
Progress & spend
100% physically complete · Contractor: China Civil Engineering Construction Corporation (CCECC)
Energy
Obiafu–Obrikom–Oben (OB3) Gas Pipeline
completed
What it is
130km pipeline designed for 2 billion scf/day, linking eastern and western gas networks; $700m project stalled for years on the River Niger HDD crossing.
Progress & spend
₦1,000bn allocated · 100% physically complete · Contractor: NNPC Gas Infrastructure Company (NGIC) / PCE Nigeria Limited
Transport
Kano–Maradi Railway (Kano–Katsina Section)
Ongoing
What it is
Kano–Katsina–Maradi cross-border standard gauge line (~400km total to Maradi, Niger); part of Tinubu's Renewed Hope Infrastructure funding scheme. Kano–Katsina corridor prioritized for Dec 2026 commissioning.
Progress & spend
75% physically complete · Contractor: Mota-Engil Nigeria (Portuguese consortium)
Energy
Mambilla Hydroelectric Power Project (Phased Revival)
Ongoing
What it is
Originally 3,050MW hydro plant; rescaled to ~1,500MW for bankability. Decades of arbitration blocked financing — Sunrise Power's combined claims exceeded $3.38bn (a $680m settlement claim plus a separate claim of over $2.7bn). An ICC tribunal ruled fully in Nigeria's favour on 17 September 2026, dismissing all Sunrise claims and ordering Sunrise and its promoter to cover 75% of Nigeria's legal costs.
Progress & spend
0% physically complete · Contractor: Energy China (CNEC/CGGC)
Change history
27 Sept 2026Corrected — summary — The cited source does not report a tribunal finding of "corruption in 2020 settlement" — that phrase conflated the tribunal's ruling with a separate rhetorical line from Tinubu. Removed; replaced with what the tribunal actually ordered (legal-cost allocation). Also corrected the claim figures to match the source ($680m + $2.7bn+, not "$2.3-3.38bn").
Digital Infrastructure
National Fibre Backbone Expansion (Project BRIDGE)
Ongoing
What it is
FEC-approved SPV (May 2024) to deploy 90,000km fibre optic cable, taking Nigeria from ~35,000km to 125,000km (Africa's 3rd longest backbone). $2bn (₦3.3tn) funded via DFI sovereign loans; 7 main rings, 37 city loops, 77 regional networks, edge data centres. Target: over 70% broadband penetration, connect 200k+ institutions.
Progress & spend
₦3,300bn allocated · 0% physically complete · Contractor: Project BRIDGE SPV (PPP with World Bank, AfDB, private operators)
Change history
27 Sept 2026Corrected — summary — The cited ministry announcement states a target of "over 70%" broadband penetration, not 90%. Corrected to match the source.