Named capital projects — roads, rail, power, hospitals, schools — funded during the 2019–present term. Tracks whether the allocated budget actually built the named thing, and how far it got.
7
Total projects
2
Completed
5
Ongoing
0
Stalled or abandoned
Transport
Toto–Umaisha Road (50km, ₦4bn+)
Ongoing
What it is
Contract awarded for ~50km asphalt road linking Toto to Umaisha. Cost >₦4bn. ₦500m released for Ugya-Umaisha electrification (work commenced). Divisional police station in Umaisha also being constructed.
Progress & spend
₦4bn allocated · Contractor: Not specified
Transport
Karu–Adon Kasa Road (Ongoing)
Ongoing
What it is
Ongoing construction. Gov Sule inspected Feb 14, 2024; expressed displeasure at slow pace, charged contractor to speed up and adhere to specs.
Progress & spend
Contractor: Not specified
Transport
Garaku–Gurku–Dari Road (15km, ₦3.67bn, Completed)
completed
What it is
15km rural road commissioned May 30, 2024. Awarded Nov 2022 to Tongy Group (Chinese firm) at ₦3.67bn. Supervised by Nasarawa State Bureau for Rural Development. 12-month original timeline.
Progress & spend
₦3.7bn allocated, ₦3.7bn spent · 100% physically complete · Contractor: Tongy Group Limited
Transport
Mararraba–Udege Feeder Road (25km, ₦3.6bn, Ongoing)
Ongoing
What it is
25km feeder road, groundbreaking performed. Awarded to Tongy Group at ₦3.6bn. 12-month timeline. Area has minerals, agriculture, tourism potential. Keffi Square/Neighbourhood Market (₦1.6bn) also groundbreaking.
Progress & spend
₦3.6bn allocated · Contractor: Tongy Group Limited
Transport
Sisin Baki–Farin Ruwa Road (15km, Federal Takeover)
Ongoing
What it is
15km road awarded last year by state. FEC approved Federal takeover (over ₦8bn for Farin Ruwa Dam + road). Federal Govt now executing. State commended Buhari/Fed Ministry of Water Resources.
Progress & spend
Contractor: Federal Ministry of Works (FEC approval)
Transport
Rural Roads Bureau Portfolio (100+ km Completed, NG-CARES + RAAMP)
completed
What it is
Bureau for Rural Development created 2021. 100+ km completed: Shabu/Doka (10), Agwade/Shepe (21), Kanje/Abuni (27.9), Kagbu (6), Masaka/Luvu (5), Mama/Farin Ruwa (16), Nasarawa/Ara (14), Ribi/Jangwa (12), Assakio/Obi (27), Gudi (1), Baure (19), Akurba (2.2), Sabon Garin Salawo (3), Kaibo (3), Keana/Abuni (27.9), Kofan Gwari (16.9), Rinze/Ngare (13.4), Alushi (5), Bukan Fadama (11), Kwandare (5). NG-CARES: 11km Bukan Fadama, 5km Kwandare. RAAMP: 966km federal rural roads (12km Rinze-Mintibi pilot). 45 additional rural roads via NG-CARES.
Progress & spend
100% physically complete · Contractor: Nasarawa State Bureau for Rural Development / NG-CARES / RAAMP
Transport
Akwanga Roads Dualisation + Lafia Underpass (Planned)
Ongoing
What it is
Dualisation of Akwanga roads approved by Fed Min Works. 50% contract sum paid for immediate mobilisation. Lafia underpass design with Fed Min Works for approval (first in state). Township roads: Baba Arago-Taal, Dankazo-Akwanga Modern Market, Andaha bridge link.
Progress & spend
Contractor: Not specified (Fed Min Works approval for dualisation)