Named capital projects — roads, rail, power, hospitals, schools — funded during the 2023–present term. Tracks whether the allocated budget actually built the named thing, and how far it got.
4
Total projects
0
Completed
4
Ongoing
0
Stalled or abandoned
Ongoing
What it is
Four projects: (1) Enerhen Junction–Marine Gate flyover; (2) DSC/NPA Expressway expansion + ¾ Cloverleaf at Effurun Flyover + 2 pedestrian bridges (4→8 lanes); (3) PTI Junction flyover; (4) DSC Roundabout flyover. First Julius Berger engagement in Delta State.
Progress & spend
₦78bn allocated, ₦19.5bn spent · Contractor: Julius Berger Nigeria Plc
Ongoing
What it is
First 100 days (May-Sep 2023): 117km roads/bridges, 85km drainages across 3 senatorial districts. 400 inherited projects + new Executive Council approvals (Upper/Lower Erejuwa, Esisi Road, PTI Road, solar street lights NPA-DSC, Oviri Court-Adagbrasa, Ohorhe-Adagbrasa, Otovwodo Junction, Nsukwa-Umute, Bedesegba Bridge).
Progress & spend
Contractor: Various
Change history
27 Sept 2026Corrected — sourceTier — Reclassified: reformeronline.com is a small outlet. Was mislabeled "reporting".
Ongoing
What it is
Flagship Ndokwa/Ukwani project: 360m main bridge + 20m span bridge with approach roads, connecting Ndokwa West and Ndokwa East across the river.
Progress & spend
Contractor: Not specified
Change history
27 Sept 2026Corrected — sourceTier — Reclassified: reformeronline.com is a small outlet. Was mislabeled "reporting".
Ongoing
What it is
Largest single project in 100-day programme: 26.21km bridges and access roads with 15km+ drainages. Multi-spur network serving riverine communities.
Progress & spend
Contractor: Not specified
Change history
27 Sept 2026Corrected — sourceTier — Reclassified: reformeronline.com is a small outlet. Was mislabeled "reporting".