Named capital projects — roads, rail, power, hospitals, schools — funded during the 2010–2015 term. Tracks whether the allocated budget actually built the named thing, and how far it got.
7
Total projects
5
Completed
2
Ongoing
0
Stalled or abandoned
Transport
Abuja–Kaduna Standard Gauge Rail Construction (Feb 2011–Dec 2014, $874m)
completed
What it is
Construction started Feb 2011 under Jonathan. $874m total ($500m China Exim Bank + FGN). 186km, 10 stations, 30 bridges (5 box bridges). Completed Dec 2014. Commissioned July 2016 by Buhari. Jonathan: major construction phase. Design was finalised in 2009 under Yar'Adua. The contract was awarded in December 2010, under Jonathan, after Yar'Adua's death.
Progress & spend
100% physically complete · Contractor: China Civil Engineering Construction Corporation (CCECC)
Change history
9 Oct 2026Corrected — summary — Folded in from duplicate id 211
27 Sept 2026Corrected — sourceTier — Reclassified: dubawa.org is independent press reporting, not a government record. Was mislabeled "official".
Transport
Abuja Light Rail Completion (61% by 2015, Commissioned 2018)
completed
What it is
Groundbreaking 2013 under Jonathan. 61% complete by 2015 (official date Dec 2015). Director Usuma: lots 1A & 3 ongoing. Buhari completed 2018. Jonathan: groundbreaking & 61% progress. A $500m China Exim Bank loan for the Abuja light rail was approved in November 2012, under Jonathan.
Progress & spend
100% physically complete · Contractor: CCECC
Change history
9 Oct 2026Corrected — summary — Folded in from duplicate id 212
27 Sept 2026Corrected — sourceTier — Reclassified: www.vanguardngr.com is independent press reporting, not a government record. Was mislabeled "official".
Transport
Umaru Musa Yar'Adua Expressway (Abuja Airport Road, 98% Complete by 2015)
completed
What it is
Awarded 2009 under Yar'Adua (₦257bn, 3 lots). Jonathan: 98% complete by May 2015, commissioned May 2015. 30km telecom duct. ₦5-15bn outstanding. Renamed Umaru Musa Yar'Adua Expressway. Commissioned by Jonathan.
Progress & spend
₦257bn allocated, ₦250bn spent · 100% physically complete · Contractor: Julius Berger, Dantata & Sawoe, CGC Nigeria
Change history
27 Sept 2026Corrected — sourceTier — Reclassified: www.vanguardngr.com is independent press reporting, not a government record. Was mislabeled "official".
Transport
Kubwa Outer Northern Expressway (ONEX) Completion
completed
What it is
Part of Outer Northern Expressway package. Commissioned by Jonathan May 2015 alongside Airport Road. Part of ₦257bn Yar'Adua Expressway package. Gateway to Abuja from North.
Progress & spend
100% physically complete · Contractor: Part of Yar'Adua Expressway package
Change history
27 Sept 2026Corrected — sourceTier — Reclassified: www.vanguardngr.com is independent press reporting, not a government record. Was mislabeled "official".
Transport
East–West Road Continuation (₦106.9bn Additional, 2011)
Ongoing
What it is
FEC approved ₦106.9bn Aug 2011 for continuation. Original Obasanjo 2006: ₦138bn (Gitto ₦26.6bn, RCC ₦29.4bn, Julius Berger ₦86bn, Setraco ₦78bn). Jonathan added ₦106.9bn. Five states: Ondo, Edo, Delta, Bayelsa, Rivers.
Progress & spend
₦106.9bn allocated · 70% physically complete · Contractor: Gitto, RCC, Julius Berger, Setraco (original Obasanjo contractors)
Change history
27 Sept 2026Corrected — sourceTier — Reclassified: t2m.org is a hosted academic PDF (Olubomehin, trunk-roads study) — credible as named research, but not primary/official. Was mislabeled "official".
Aviation
Aviation: 22 Federal Airports Renovated + US FAA Category-1 Certification
completed
What it is
22 federal airports renovated. Achieved & maintained US FAA Category-1 Certification (highest aviation safety). Phase I (May 2012): Lagos, Calabar, Kaduna, Enugu, PH, Kano, Yola, Owerri, Benin, Jos, Abuja, Lagos GAT. Phase II (Dec 2012): Sokoto, Akure, Katsina, Ibadan, Ilorin, Makurdi, Bauchi, Maiduguri, Gombe, Jalingo. Fire hydrants at MMIA, Abuja, Enugu, Benin. Solar/generators at Lagos & Kano.
Progress & spend
100% physically complete · Contractor: Various (FG, NCAA, FAAN)
Change history
27 Sept 2026Corrected — sourceTier — Reclassified: www.premiumtimesng.com is independent press reporting, not a government record. Was mislabeled "official".
Transport
Inland Waterways & Ports Development (400% Passenger, 100% Cargo Growth)
Ongoing
What it is
Inland waterways passenger traffic +400%, cargo +100%. Several inland ports established. Key waterways dredged (Niger, Benue). MoU for coastal rail Lagos-Calabar signed. Waterways as alternative transport.
Progress & spend
80% physically complete · Contractor: NIWA, private operators