Civic Accountability · Nigeria

NGScorecard

Previously in Gombe:
Term report
Named capital projects — roads, rail, power, hospitals, schools — funded during the 2019–present term. Tracks whether the allocated budget actually built the named thing, and how far it got.
5
Total projects
0
Completed
5
Ongoing
0
Stalled or abandoned
Transport
Gombe Capital Zone Roads & Stormwater (20.55km, ₦24.22bn)
Ongoing
What it is
20.55km roads + stormwater. Dualisation: Bauchi Rd Junction → FTH → Potiskum Rd. 7.5km reinforced concrete drains (Hotel → Nayi-nawa). ₦20.24bn roads + ₦3.98bn drains = ₦24.22bn. Eases congestion, enhances safety, connects Ibrahim Dankwambo Motor Park. Triacta Nig Ltd, 12-month timeline.
Progress & spend
₦24.2bn allocated · Contractor: Triacta Nig Ltd
Transport
SEC-Approved 17 Roads & Bridges Package (₦38bn, 2023)
Ongoing
What it is
SEC approved Jan 26, 2023: 17 roads + bridges, ₦38bn. Network 11-100 initiative. 3-12 month completion periods. Includes hospital roads, township roads, bridges, college access roads across 3 senatorial districts.
Progress & spend
₦38bn allocated · Contractor: Various (Engr Abubakar Bappah supervision)
Change history
27 Sept 2026Corrected — sourceTier — Reclassified: tribuneonlineng.com is independent press reporting, not a government record. Was mislabeled "official".
Transport
BAP4 Layout + Ashaka Road Dualisation (18.5km, ₦20.4bn, Triacta)
Ongoing
What it is
SEC approved Jun 3, 2024: 18.5km dualisation (FTH Junction → Police HQ → FCE(T) → Ashaka Rd). Triacta Nig Ltd, ₦20.4bn, 12-month timeline. Also: Dukku-Dokoro 2-span bridge (₦1.593bn, 4mo). Emergency repairs Dukku-Dokoro washout.
Progress & spend
₦20.4bn allocated · Contractor: Triacta Nig Ltd
Change history
27 Sept 2026Corrected — sourceTier — Reclassified: tribuneonlineng.com is independent press reporting, not a government record. Was mislabeled "official".
Transport
Tumfure Road Network (11km, First in Area History)
Ongoing
What it is
11km Tumfure road network flagged off May 25, 2024 (5th anniversary). First road in area since 1996 state creation. Triacta Nig Ltd (₦1.2bn CSR). Housing Minister Dangiwa: 'construction site everywhere'. 550 housing units (Shongo Garden, Family Homes Fund). Renewed Hope Houses (250 units).
Progress & spend
Contractor: Triacta Nig Ltd (₦1.2bn CSR)
Change history
27 Sept 2026Corrected — sourceTier — Reclassified: insightnortheastng.net is a local blog. Was mislabeled "reporting".
Transport
Network 11-100: 100km+ Roads per LGA (11 LGAs)
Ongoing
What it is
Network 11-100 initiative: 100km+ roads in each of 11 LGAs. Commissioner Bappah Feb 2023: 'resolve to construct at least 100km in each LGA'. 38bn SEC package + 20.4bn + 24.22bn = major push. Prompt payment assured for contractors.
Progress & spend
Contractor: Various
Change history
27 Sept 2026Corrected — sourceTier — Reclassified: tribuneonlineng.com is independent press reporting, not a government record. Was mislabeled "official".