12
Total tracked
5
Kept
4
Partial / mixed
1
Broken
Kept
Partial / mixed
Broken
In progress
Kept
The promise
Promised to modernise Jigawa's agriculture sector and campaigned on positioning the state as a leading non-oil economy.
Assessment
Introduced a farming-cluster system under the slogan 'Farming is a Business', credited with boosting the state's sesame export sector and drawing recognition from agribusiness firms such as WACOT.
Kept
The promise
Promised to expand irrigated farmland to boost food security and job creation.
Assessment
The 5,700-hectare Hadejia Valley Irrigation Scheme at Auyo was completed and formally inaugurated by President Buhari in February 2023, near the end of Badaru's tenure.
Kept
The promise
Promised to reposition Jigawa's weak internally generated revenue base.
Assessment
IGR collection rose from under ₦1 billion a year under the previous administration to over ₦10 billion in 2017, according to the state government.
Partial
The promise
Promised to diversify Jigawa's non-oil economy, drawing on Badaru's prior role chairing federal committees on fertiliser distribution and non-oil revenue.
Assessment
Sesame and agro-processing investment expanded, but the state's economy remained heavily dependent on federal allocations through the tenure.
Partial
The promise
Promised improved access to healthcare including specialist services.
Assessment
The administration recruited 32 medical doctors and sponsored 60 students to study medicine in China from 2016, and built the Birnin Kudu Specialist Hospital, though the state's doctor-to-population ratio remained low relative to national averages.
Partial
The promise
Promised improved road connectivity across the state.
Assessment
Projects including the dualised Unity-Pentagon-Fanisau Road were completed, part of a wider infrastructure push inaugurated jointly with President Buhari in 2023.
Partial
The promise
Promised to expand access to basic education.
Assessment
The state government approved ₦3.4 billion for a mix of drainage and classroom-block projects in the education sector, part of a broader capital works push rather than a single flagship reform.
Broken
The promise
Campaigned on prudent, transparent management of state resources.
Assessment
A Jigawa State House of Assembly Public Accounts Committee probe opened into Badaru's 2019-2024 tenure found questionable procurement procedures, unverifiable expenditures, missing financial records and budget overruns, and the EFCC separately arrested a former commissioner from his cabinet.
Kept
The promise
Promised to complete all inherited road projects before starting new ones.
Assessment
Inherited 42 road projects (₦87bn). Completed 40/42 by 2020. Inherited 476km rural roads (₦54.5bn), 97.4km feeder roads (₦1.65bn), 142km township roads (₦32bn). Saved ₦3bn on township roads, ₦8bn on regional roads, ₦445m on feeder roads. Paid ₦22bn of ₦491m outstanding on feeder roads, ₦8bn of ₦15bn on regional roads.
Kept
The promise
Promised massive road construction across Jigawa State.
Assessment
93 roads constructed 2015-2021. 42 inherited roads (716.5km) completed. 51 new roads (820.6km, ₦72bn) constructed. Total 1,537km by Sep 2020. 1,537km = 716.5km inherited + 820.6km new. 93 roads = 42 inherited + 51 new.
completed
The promise
Promised new regional, feeder, and township roads after clearing inherited backlog.
Assessment
₦22.45bn approved Dec 2018 for 18 roads (8 regional, 9 feeder, 3 township). 2016: 20 new roads (8 regional, 9 feeder, 3 township). 2017: 2 township, 7 regional. 2018: 9 roads (₦23bn). Most completed by 2019. Dutse-Madobi-Katanga, Dangwali-Baranda (₦4.6bn), Darai-Gilima (₦2.4bn), Gambara-Waza (₦3.1bn), Gumel College road (₦674m), Babura-Yarkirya (₦4.9bn), Bariki-Munzarau (₦2.6bn), Kaugama township (₦1.3bn), Babura township (₦2.6bn), Harbo Sabuwa (₦241m).
Ongoing
The promise
Promised rural road construction under RAAMP with World Bank/AFD support.
Assessment
RAAMP projects ongoing. 115km Phase 1 flagged off Sep 2024 (Charachara 30.33km, Mainamaji 25.8km, Akuyam 18.88km, Durum 15km, Garin Gami 25km). ₦2.4bn counterpart paid. Phase II (155km) planned. Total ~300km by end 2024.