Named capital projects — roads, rail, power, hospitals, schools — funded during the 2022–present term. Tracks whether the allocated budget actually built the named thing, and how far it got.
5
Total projects
1
Completed
4
Ongoing
0
Stalled or abandoned
Ongoing
What it is
First flyover in Ile-Ife. Flagged off May 7-8, 2024. 12-month timeline. Ooni of Ife: 'deepens Osun East economy, links major economic arteries'. Part of 5-flyover plan (2 Osogbo, 1 Ile-Ife, 1 Owode-Ede, 1 Ikirun).
Progress & spend
₦14.9bn allocated · Contractor: Sammya Nigeria Limited
Ongoing
What it is
Seven-span bridge at Oke-Fia intersection. Flagged off Dec 6, 2023. Part of dualisation projects (Old Garage→Okefia→Lameco Roundabouts, 11.17km total with Ede dualisation).
Progress & spend
₦10.8bn allocated · Contractor: A'skorj Nigeria Limited
Ongoing
What it is
Three major Ede projects flagged off Dec 2023. Total ₦24.3bn allocated to Ede (governor's hometown). Includes dual 2-span Osun River bridge and 4-span Erinle River bridge (Raregeode, ₦3.94bn). 55.86km LG roads (₦30.68bn) also in Phase I.
Progress & spend
₦24.3bn allocated · Contractor: Enginec International (Akoda), Raregeode (Osun/Erinle bridges)
Ongoing
What it is
11.17km dualisation commenced Dec 6, 2023. Osogbo: Old Garage→Okefia→Lameco Roundabouts. Ede: Akoda→Cottage→Baptist High School. 1-year completion target.
Progress & spend
Contractor: Various
completed
What it is
Private sector road sponsored by Mr. Rasheed Sarumi, commissioned by Gov Adeleke Oct 2023. Govt constructed 55km own roads + 45km in pipeline. 'Not a crime to honour citizen giving back'.
Progress & spend
100% physically complete · Contractor: Rasheed Sarumi (private)